Grouped by topic: the platform, financial steering, day-to-day use, implementation. If yours isn't here, write to us — we will add it.
CESAR connects the operational management of projects to their financial reality, in a single data repository: the purchase order, the budget, the schedule, the recorded days, the valued production, WIP and the accounting entries describe the same deal, with the same figures.
The practical consequence: the margin displayed during the project is the real one, and it is known within the month — not at the close, three months later.
See the platform overview.
A project management tool answers “where are we?”. CESAR also answers “how much does it cost, how much does it earn, and what can we invoice this month?”.
That difference has a technical consequence: the days entered by employees, the budget approved by the manager and the amounts invoiced by sales administration must live in the same system. As soon as an export and a reconciliation between two tools are needed, the gap reappears, and with it the delay.
Seven profiles, with distinct rights and screens:
No, and that is not the goal. CESAR stops where accounting begins: it produces entries in the format your accounting system expects, without re-keying or intermediate files.
An open API connects the rest: ERP, CRM, HR master data. On the other hand, CESAR generally replaces the Excel files used for time tracking, capacity planning and invoicing preparation — that is where the gaps hide.
In order, because it is hard to budget what you have not planned:
Details in the article Estimating a project by deliverables.
Yes, and it is the recommended approach. You first plan generic resources — “three days of senior developer in November” — then replace them with actual resources when assignments are decided. Replacement works both ways.
Whatever has not found a taker remains visible as remaining to plan, expressed in skills: actionable information for arbitrating or recruiting.
An employee's available capacity is not their number of working days:
Available capacity = working time − absences − non-project activities.
On a basis of twenty working days, four days of internal meetings, training and day-to-day management plus two days of absence leave fourteen days actually available. A manager who does not produce on projects has zero project capacity, and that is normal.
The orders of magnitude we observe among our clients: 75 to 85% project capacity in consulting and IT, 70 to 80% in industry and engineering, 60 to 70% in the public sector. Available capacity is almost always overestimated at the time of commitment.
Yes. The billing plan is built from the contract and aligned with the production milestones of the deliverables. At each due date, you have the seven figures needed to decide what gets invoiced: budget, actuals, estimate to complete, production, forecast invoicing, invoiced, remaining to invoice.
Yes, and it is the central mechanism of the month-end close. Amounts to invoice are calculated according to the engagement model — fixed price, T&M, TMA, subscription — from approved and frozen time entries.
Spending is controlled in both directions: vertically by department, cross-functionally by project. Internal recharging between departments and resource loans are handled the same way.
Progress and weather by project, cost and schedule performance indices, monthly spending tracking, risks on cost, quality, scope and schedule — at project level as well as portfolio level.
Two decision aids are added: project prioritisation on criteria you define, and an estimate consistency check that compares a new estimate with your reference projects to flag obvious gaps.
The eight indicators we recommend for a monthly review are detailed here.
By default CESAR shows the planned time in the timesheet: you correct rather than enter. See the article The timesheet is a management tool.
In two stages. The employee checks their entry, adds non-project activities and absences, comments on variances, then approves. That approval opens the hierarchical approval: the manager checks, sends back if necessary, then approves in turn.
Once approved, the period is frozen and archived. Later corrections go through as adjustments in the following period, traced as such — that is what makes the data enforceable with the client as well as the statutory auditor.
A delegation is declared in the account settings: the person designated and the period concerned. The delegate enters time on your behalf during that window, and approval remains subject to the same workflow.
Another option when the workload is predictable: enter in advance. CESAR lets you fill in the following month.
It is the common use case: the platform is online, the schedule is shared and updated in real time, and there is no local version of a file to reconcile.
Access rights are managed in detail, which lets several entities, subsidiaries or countries work on the same repository without each seeing the others' data.
Every month, CESAR Intelligence produces an economic analysis report on the scope of your choice: WIP (accrued and deferred income), budget and contract margins, cost overruns, order-to-budget compliance, workload and concentration, then dated recommendations, each assigned to an owner.
The details are on the CESAR Intelligence page.
The figures do not come from the AI: they are calculated directly from your data, using a 28-indicator framework published in every report. The AI writes the commentary and recommendations from those results; it produces no figures.
No. It is used only to write your report; it is neither retained by the model nor used to train it. The model is European and runs in France.
No. CESAR Intelligence is switched on in your current environment, on the data your teams already enter. Who decides on the actions? Your teams: every recommendation is assigned to an owner, who approves it or not.
Two to three months on a chosen scope, with one indicator tracked before and after — unbilled production, critical WIP or cost overruns — then a review to decide on activation.
In five steps: scoping, configuration, pilot on a limited scope, roll-out, then day-to-day operation. The pilot is not a formality — it is where the project breakdown and the list of non-project activities, on which everything else depends, get corrected.
Details, durations and what we expect from your teams are on the Deployment page.
At set-up: scoping workshops, configuration, training for the different profiles — employee, manager, project manager, management control — and online documentation.
Afterwards: a named contact, email and phone support, and a periodic review of actual usage. We check in particular that the platform is being used as intended; degraded usage over several months costs more than a technical problem.
Three effects can be measured, in this chronological order.
We prefer not to quote a standard payback period: it depends on your size, your share of billable activity and team discipline. We are happy to estimate the order of magnitude on your scope, from your own figures.
In France, in two data centres in the Paris region: servers at Foliateam, ISO/IEC 27001 and HDS certified — certified health data host —, backups at Equinix, ISO/IEC 27001, ISO 22301 and ISO 9001 certified. Artificial intelligence features run on a European model, in France: your figures are neither kept after processing nor used to train a model.
It is a prerequisite for most of our clients in banking, insurance and the public sector — and a good question to ask all your software vendors. Details are on our Security and GDPR pages.
Tell us how you manage today: structure, closing rhythm, systems in place. We will prepare a demo on a comparable context.