Domain 02 · The lifecycle of a deal

Projects

The breakdown is what makes the margin calculable. A badly structured project produces figures that are right in total and wrong everywhere else — and nobody notices before the close.

Project manager tracking the schedule of his deliverables across several screens
The problem

You don't start a project from a blank page

Structuring a deal from scratch means weeks of configuration — and two comparable projects that, lacking a common framework, no longer look alike. CESAR does the opposite: every project starts from a ready-to-use template, pre-configured by business, that you instantiate and then adjust.

01 — The framework already exists

A ready-to-use project template

The usual phases, workstreams and deliverables of the business are pre-configured. You instantiate the template when the deal starts; the breakdown does not have to be reinvented.

02 — Adjust, don't rebuild

Set-up takes minutes

The project starts from the framework. You change what is specific to the deal and keep the rest — instead of starting from a blank page with every new order.

03 — Deals become comparable

The same structure, from one project to the next

Two projects from the same template have the same breakdown. Their margin variances become interpretable, and every deal improves the next template.

The schedule

Assign resources according to their real availability

Setting milestones is not enough to keep a deal on track. The schedule assigns each resource to a deliverable according to its availability rate — the time actually available once leave, other projects and recurring tasks are deducted. This granularity is what separates a planned workload from wishful thinking.

ResourceAvailabilityWhat the rate changes
Project manager
40%
Two days a week actually available for the deal; the rest goes to the portfolio. Assigning them at 100% would distort the whole workload.
Design engineer
80%
The core of production. Under-load and overload both show immediately, deliverable by deliverable.
Business expert
15%
Occasional but critical: booked on the milestones that require them, never tied up full-time on one deal.
The principle
Theoretical capacity− leave− other deals− recurring tasks
Available capacity× availability rate= workload that can actually be assigned

A resource assigned beyond their availability is not an alert: it is the cause of a delay you will only see at the close. The schedule consolidates workload by resource and by project, and brings the conflict to light before it costs anything.

Project management

Steer by results, risks and deadlines

Once the deal is under way, steering does not mean watching a chart. It means holding three lines at once — what is produced, what threatens the deal, and what must be delivered on time — from the same breakdown as the budget.

Steering by — Results
What is actually produced

Progress is measured by deliverables produced, not by time spent. Estimate to complete and budget variance can be read continuously, at every level of the tree. “Busy” is no longer mistaken for “progressing”.

Steering by — Risks
What threatens the margin

Each risk is identified, rated and attached to a workstream. When it materialises, its impact on the margin at completion is already quantified — the decision is made on an amount, not on a hunch.

Steering by — Deadlines
What must be delivered on time

Milestones and dependencies are held in the single breakdown. A slipping date carries its effect through to resource workload and the billing schedule, without re-keying.

CESAR project report: CQFD risks, progress, status, points of attention, actions, next steps, dates and workload indicators
Project reportIssued 27/08/2026Demo data
Financial steering

Fixed price, time & materials, subscription: three models, one single mechanism

A dedicated module carries the contract type of each deal. Each one has its own revenue recognition and invoicing rules — CESAR applies them without re-keying and consolidates WIP, margin and cash whatever the model.

Model — Fixed price
A commitment to a result

Revenue recognised on percentage of completion, estimate to complete tracked by deliverable, accrued and deferred income calculated at the close. Margin at completion stays under control, even when time spent overruns the price sold.

Model — Time & materials
A commitment to resources

Valuation of recorded person-days, caps and recharging tracked continuously. Workload overrun becomes visible before it exceeds the ordered envelope.

Model — Subscription
A commitment over time

Recurring revenue spread over the schedule, MRR and ARR consolidated, renewals and amendments tracked. Tomorrow's revenue reads as clearly as this month's figure.

What it changes
Three models managed in three separate logics→ three truths that never consolidate
Three models, one single WIP mechanism→ a portfolio margin that is finally comparable

Whether a deal is sold at a fixed price, billed on time & materials or renewed as a subscription, it enters the same WIP and can be compared with the others. That is the condition for steering at portfolio level, not just project level.

Next in the chain

What this domain feeds

See it in a demo

Let's see how your deals break down

Bring two comparable projects. We will show you what a common framework changes in how you read them, and what the breakdown by deliverable reveals.