A badly designed timesheet is filled in from memory, on the last day of the month, in twenty minutes. The data that comes out of it is worthless — and yet it is what invoicing relies on.
The first decision, and it determines buy-in: how finely are people asked to enter time? The useful answer is the hour or the quarter day. Not the minute.
A timesheet is not a time clock. Its purpose is not to check attendance, but to know where the company's effort goes. To the half hour, you get fictitious precision: nobody remembers yesterday's half hour, so everyone makes it up. By the day, you lose the split between projects, which is precisely the information you are after.
The entry structure matters as much as the granularity: projects broken down into phases and deliverables, and a list of non-project activities standardised at company level — management, meetings, training, pre-sales. If each team creates its own headings, no consolidation will be possible.
Month-end entry is a reconstruction. It produces round figures, a smoothed split, and a lot of time allocated to the project best remembered.
The rhythm that works is weekly, based on the calendar: you open your calendar and copy it over roughly. Ten minutes on Friday, versus an hour of approximate reconstruction on the 31st.
A simple lever improves the completion rate further: show the plan by default in the timesheet. The employee doesn't start from an empty grid, they correct what was planned. The mental load changes in nature, and the plan/actuals gap becomes visible at the very moment of entry.
It is the most common design error. A timesheet that contains only projects gives uninterpretable utilisation rates: is an employee at 60% on projects 40% available, or in training, on leave, in pre-sales?
Non-project activities and absences must live in the same timesheet. That is the condition for the capacity plan to reflect real capacity, and not an ideal of 220 days a year that nobody reaches.
A useful side effect: the timesheet makes visible what nobody measures. Time spent in meetings, for example, becomes a fact to discuss as a team rather than an impression.
An inaccurate timesheet is not an administrative problem. It has four concrete consequences:
In other words: the quality of all financial steering is capped by the quality of this entry. That is why it deserves to be designed as a routine useful to the employee, and not as a reporting obligation.