Domain 05 · CESAR Intelligence

The AI that analyses your WIP, margins and costs

On your own figures. CESAR calculates, the AI explains, you decide.

European model · Inference in France · Data neither retained nor reused

Project economic analysisDemo department · 42 active projects
Key points
€319,360Net WIP (accrued − deferred income)
9 projectsin the critical zone
€222,720Unbilled production
42.5%Budget margin
Summary written by the AI figures calculated by CESAR

The portfolio delivers a 42.5% budget margin, but 9 critical projects hold 66% of WIP. Priority this month: bill the €222,720 of production already delivered and deal with project D-104, under double strain.

Priorities
  • 48 hProject D-104 under double strain: €38,200 of WIP and a negative margin.
  • 48 hIssue the invoices for 6 projects producing without billing: €222,720.
  • 7 dPrepare an amendment: production on project D-087 exceeds the order by €11,300.
Demonstration data
Team analysing the variances on a management dashboard
From measurement to decision

Measure, understand, act: in the same CESAR

The client does not change software. CESAR Intelligence relies on the data your teams already enter: budgets, days consumed, production, invoicing, orders.

01 · CESAR

I measure

Production, costs, invoicing, WIP and margin, in real time, from scheduling to the close.

02 · CESAR Intelligence

I understand

Why a project drifts, why margin falls, where the WIP risk is concentrated.

03 · CESAR Intelligence

I act

Dated priorities, within 48 hours or within 7 days, each with an owner.

The five drifts

What CESAR Intelligence does about the five drifts

The same drifts that advance unseen between project management and finance, each with its response.

DriftWhat CESAR Intelligence doesStatus
Costs drift
Spots the projects whose cost exceeds the budget, quantifies the overrun and flags those nearing the threshold.
Available
Production goes unbilled
Lists the projects producing without billing and calculates the share that can actually be billed, capped by the order.
Available
Timesheets are incomplete
Will flag missing time entries before they distort the margin calculation.
Coming soon
WIP keeps growing
Ranks projects as Critical or Watch, isolates the largest WIP balances and the over-billing to absorb.
Available
Margin erodes
Compares budget margin with contract margin, and isolates projects under double strain, WIP × margin.
Available
Available now

Every month, the analysis your management controllers don't have time to write

On the scope of your choice (a unit, a department, a portfolio), CESAR Intelligence produces a complete report, ready to share in committee.

Management controller checking invoices at her desk
Key points

One page to decide

The key indicators and the three priorities of the month.

WIP

Accrued income, deferred income and alerts

Alert levels, largest WIP balances, share that can actually be billed.

Margins and costs

Three readings of margin

Budget, contract and actual; cost overruns; the most degraded projects.

Compliance

Order and budget

Gaps between order and budget, amount left to bill, amendments needed.

Workload

Workload and concentration

Progress, productivity, dependence on one client or one manager.

Recommendations

Dated actions

Urgent or short term, each with a named owner.

Key takeaways page of the report: net WIP, critical zone, unbilled production, margin and three priorities within 48 hours
Key takeaways. The four key indicators and the month's three priorities.
Financial cycle chart: orders, budget, production, billing and net WIP
Financial cycle. From order to net WIP, at a glance.
Prioritised recommendations from the report, urgent within 48 hours or short term within 7 days, each with an owner
Recommendations. Within 48 hours or within 7 days, each with a named owner.

Extracts from an actual report generated on demonstration data (report in French): clients, projects and amounts are fictitious.

Method

The AI writes. It does not calculate.

Every indicator is calculated directly from your CESAR data, using a framework of 28 indicators published in the appendix of every report. Generative AI is limited to writing: it produces no figures.

Every report ends with its methodology note: margin definitions, alert thresholds, edge cases, and indicators deliberately left out when they would not be reliable.

  • AProfitability5
  • BWorkload and productivity4
  • CForecast at completion4
  • DContract compliance4
  • EWIP diagnosis4
  • FCross alerts5
  • GConcentration and risks2
An analysis is only as good as its data

With the capacity plan, the schedule stays aligned with the budget and the estimate to complete, closed months are never changed and no resource is overloaded. The capacity plan guarantees accurate data; CESAR turns it into margin and WIP; CESAR Intelligence turns it into decisions.

Sovereignty

Your figures stay yours

The AI runs on the same foundation as the rest of CESAR, and only on your data.

European model, inference in France

Your cost and margin data never leaves France.

No retention, no training

Your data is used only to write your report.

ISO 27001 and HDS certified hosting

The same foundation as the rest of CESAR. See the security page.

You stay in control

The AI proposes; your teams review and decide.

Next

What comes next

Management team making decisions from its project indicators
  • Continuous alerts Coming soonThe report's signals, directly in the tool, without waiting for month-end.
  • Incomplete timesheets Coming soonMissing time entries flagged before the close.
  • Natural-language questions Coming soon“Which projects have critical WIP and a margin below 10%?”
  • Action agents Coming soonPreparing billing releases and reminders, for your teams to approve.
Plans

Three levels, inside your CESAR

CESAR Intelligence is switched on in your CESAR environment, with no change of tool and no change to your core contract.

Discover · Available

Start

The monthly economic analysis report on your scope.

Day-to-day control · Coming soon

Business

Start, plus continuous alerts and on-demand analyses.

Large accounts · Coming soon

Enterprise

Business, plus multiple scopes, governance and action agents.

Pricing on request, depending on your scope.

Start with a pilot

Let's see what CESAR Intelligence finds in your projects

A 2- to 3-month pilot, on your own data. Together we choose one indicator to track (unbilled production, critical WIP, cost overruns) and we measure the difference before and after.

Frequently asked questions

Your questions about CESAR Intelligence

Is my data used to train a model?

No. It is used only to write your report; it is neither retained by the model nor used to train it. The model is European and runs in France.

Can the AI get the figures wrong?

The figures do not come from the AI: they are calculated directly from your data, using published formulas. The AI writes the commentary and recommendations from those results.

Do we need to change our version of CESAR?

No. CESAR Intelligence is switched on in your current environment, on the data your teams already enter.

Who decides on the actions?

Your teams. Every recommendation is assigned to an owner, who approves it or not.

How does a pilot work?

Two to three months on a chosen scope, with one indicator tracked before and after, then a review to decide on activation.

See it in a demo

From measurement to decision, on your own projects

In thirty minutes, we show you the CESAR Intelligence report on a scope close to yours.