A close doesn't slip on closing day. It is prepared over eleven months, and it shows — as long as you look somewhere other than in the accounts.
A close doesn't slip on closing day. It is prepared over eleven months. And it shows well before, as long as you look somewhere other than in accounting.
Five symptoms. None is accounting. All are on the projects side.
“Can you confirm the progress?” “How many hours have been consumed?” Management control chases project managers on D-1. Every month.
It is not a discipline problem. It is a sign that time entry serves nobody but the person asking for it. Data that is requested only once a month, for a table the person entering it will never see, will always be produced late and grudgingly.
A whole week rebuilt on Friday evening. Eighty team hours entered in fifteen minutes.
You then measure what you remember, not what happened — and memory always rounds in the same direction: towards the project most talked about, towards round figures, towards what was planned.
A project announced at 60% in March is still at 60% in April. Then 75% in May. A downward revision during the year? Almost never.
A project that never goes backwards is not a well-run project. It is a project where nobody dares say it has slipped. As long as announcing a delay costs more than keeping quiet, the figure will stay optimistic — until the month it becomes untenable.
The budget is overrun by €120k. People look for why. They always find something: a change of scope, an added resource, a client delay.
The explanation always ends up arriving. The problem is that it arrives afterwards. A cause identified three months later is no longer a cause, it is a justification — and you don't steer with justifications.
“Where are we on this project?” “What remains to be invoiced?” The calculation exists. But it is in an Excel file, in an email, in a business tool — or in someone's head.
It is the most serious symptom, because it is no longer a steering problem but a continuity problem: the day that person changes jobs, the company loses the memory of its WIP.
None of these five symptoms appears in accounting. All are paid for at the close, in four ways:
The usual reflex is to reinforce the close: more chasing, more checks, one more meeting. That treats the symptom when it is most expensive to treat. Three levers upstream are worth more:
What the three have in common: they move the effort from closing day to the eleven months before it. That is the only place where it produces anything.
Plan shown by default in the timesheet, dated approval workflow, freezing and archiving of periods, estimate to complete entered by the project manager and estimated cost at completion recalculated at every close. Entries then go to accounting without manual rebuilding.
Third article in the series on project management control, after WIP and project working capital. One topic remains: accrued and deferred income, the accounting translation of everything above. For the steps of the close itself and the day-by-day countdown, see the monthly accounting close.