Production tracking

What your teams have consumed, what it costs you, what it produces and what remains to be done — period by period, on the same data as your budget and your invoicing.

Production tracking — example
Period 10/2026 · cumulative view
Actuals8.00 days
Avg daily cost€500.00
Actual cost€4,000.00
Rate adjustment€8,000.00
Production€8,000.00
Operating margin€4,000.00
What it solves

A project's margin is not calculated at quarter end

Production tracking is the screen where time spent becomes money. It removes the three blind spots that cause drifts to be discovered too late.

01 — Valuation

Actuals become production

Each day entered is valued at the daily rate in force on the deliverable. The month's production can be read without waiting for invoicing.

02 — Landing

Estimate to complete is kept up to date

Estimate to complete and estimated cost at completion are recalculated with every entry. The budget variance is visible during the project, not after.

03 — Consistency

One single version of the figures

Budget, actuals, production and invoiced amounts come from the same data repository. Management control and the project manager read the same amounts.

The dictionary

What each column means

Production tracking reads from left to right: what was planned, what was consumed, what it produces, what is invoiced.

ColumnGroupDefinition
Qty
Budget
The number of days budgeted for the deliverable.
Daily rate
Budget
The average daily rate charged to the client, by deliverable and by resource.
Budget
Budget
Quantity multiplied by the daily rate. Original budget, then revised during the project.
Actuals
Cost
Person-days actually entered over the period, by resource.
Avg daily cost
Cost
The resource's average daily cost. It is what the day costs you.
Actual cost
Cost
Actuals multiplied by the average daily cost. The expense incurred over the period.
ETC
Cost
The estimate to complete, in days, declared by the project manager.
Estimated cost at completion
Cost
Actual cost plus valued estimate to complete. The expected landing of the deliverable.
Operating margin
Margin
The difference between what the deliverable produces and what it actually costs.
Production rate
Production
The month's production rate, the basis for calculating theoretical production.
Production
Production
The revenue recognised over the period for the work done.
Rate adjustment
Production
The production correction resulting from a change in the daily rate.
Invoiced
Invoicing
What has actually been invoiced to the client over the period.
Production tracking screen, cumulative view
The real screenCumulative viewDemo data

The columns displayed can be configured by profile: a project manager and a management controller don't look at the same ones.

Two readings

The month, or since the start

The same screen can be read in two ways, without changing the data source.

Production tracking screen, monthly view
The real screenMonthly view · period 07/2026Demo data
Monthly view
What happened over the period

Production, cost and margin for the month alone. It is the closing view: you approve one period, then move on to the next.

Cumulative view
Where the deliverable stands since the start

The total since the project opened, estimate to complete included. It is the landing view: it answers “will it hold”.

The key mechanism

A revised budget does not distort history

Many projects start without a budget, the purchase order not yet received. Time is consumed nonetheless. When the budget arrives, CESAR revalues prior periods instead of leaving them at zero.

01

Nothing is lost

Time consumed before the budget arrived is not abandoned. It is valued as soon as the envelope is entered, in the period in which it was recorded.

02

Nothing to re-enter

Revaluation is automatic. No spreadsheet rework, no manual correction to make on a period already closed.

03

The cumulative total stays right

The project's cumulative production includes the catch-up. The steering figure and the figure sent to accounting do not diverge.

What it changes
Before the budget is entered→ 8.00 days consumed, no production
After→ the 8 days are valued, the cumulative total is up to date

The project recovers the production it is due for the period in which the time was recorded, without any entry being redone by hand.

The safeguards

The system flags what is about to slip through

The most costly variances are the ones nobody looks at. Three checks bring them to light on their own.

Alert

Unvalued actuals

If a project shows actuals while its budget is zero, a message prompts the manager to enter a budget before month-end close.

Filter

Projects without a budget

The portfolio has a dedicated filter that isolates all the projects concerned in one click, so the manager can deal with them in one go.

Indicator

Flag at portfolio level

A warning icon marks these projects in the list, with no need to open each record to spot them.

Upstream, downstream

The modules that feed this tracking

Production tracking enters nothing: it reads what the other modules produce, and in turn feeds invoicing.