Project prioritisation: one grid, one capacity, one decision

Prioritising is not about scoring projects. It is deciding which ones go first when you cannot do everything — and writing it down, so that the decision holds until the next quarter.

November 2026· 7 min read· Portfolio
Management committee in discussion around a meeting table
Key points
  • Prioritising means ranking projects to decide which ones to do first with limited capacity — not giving them a score.
  • The method matters less than two rules: the same criteria for everyone, and a test against the teams' capacity.
  • Mandatory projects are taken out of the ranking: they go first, and you prioritise what is left.

What prioritising means

Project prioritisation means ranking the projects in a portfolio — new requests and projects under way — to decide in which order to deliver them, given the budget and the people available. It produces an ordered list and, above all, a cut-off line: what is above it gets done, what is below it waits.

It is different from the annual project plan. The annual plan sets the scope for the year, once a year. Prioritisation is replayed at every trade-off: a new request, a project going off track, a team losing a skill. It is the same grid, applied more often.

The five methods

None is better in absolute terms. Each one fits a situation, and most organisations combine two: a quick method for sorting, a finer method for deciding the top of the list.

MethodPrincipleWhen to use itIts limit
Weighted scoringEach project is scored on a few criteria, each criterion has a weight. The score is the weighted sum.Heterogeneous portfolio, decisions in committeeIf the weights are negotiated, so is the result
Value / effort matrixTwo axes, four boxes: quick wins, major projects, small projects, projects to drop.First sort of a long list of requestsToo coarse to separate the top of the list
MoSCoWMust, Should, Could, Won't: essential, important, desirable, not now.Prioritising the content of a project (work packages, features) rather than a portfolioWithout a rule, everything ends up as Must
Cost of delayWhat a month's delay on this project costs: lost gain, penalty, risk.Time-bound gains: regulatory, seasonality, contractRequires putting a figure on value, which few requesters do
WSJFWeighted Shortest Job First: the cost of delay divided by the size of the project. Small, high-value projects move ahead.Continuous flow of requests, agile organisationsRelative estimates, hard to defend before a finance committee

Building the grid

Weighted scoring is the most widely used method in portfolio committees. It works if the grid is built before scoring, not during it.

  1. Four or five criteria, no more. Beyond that, criteria overlap and the final score no longer discriminates. Value, strategic alignment, urgency and risk control cover most cases.
  2. A 1-to-5 scale, defined in writing. "Value = 5" must mean the same thing to everyone: for example, more than €500k of annual gain or a major risk avoided.
  3. Weights set before scoring. Not adjusted afterwards to push a project up.
  4. Scoring by several people. The requester proposes, the PMO and management control challenge, the committee decides.
  5. Obligations outside the scoring. An end of support, a regulatory deadline, a contractual commitment are not scored: they go first, and use up their share of capacity first.

The cost of each project does not enter the score: it comes in when the ranking is tested against capacity. The estimate remains coarse at this stage — see estimating a project by deliverables.

A worked example

An IT department has 900 person-days over the half-year, once recurring work has been deducted. Six projects are candidates. The ERP migration is mandatory — end of support for the current version — and uses 300 days: 600 remain to be shared out. The other five are scored with the following weights: value 40%, alignment 25%, urgency 20%, risk control 15% (5 = low risk). Efforts are in person-days.

ProjectVal.Align.Urg.RiskScoreDaysCumulative
Billing automation53444,15120120
Customer portal redesign44333,65250370
Financial reporting34353,5560430
Field mobile app42323,00200630
Data platform35112,80350980

The first three projects fit within 430 days. The mobile app would take the cumulative total to 630 days, beyond the 600 available: it must be reduced to a first work package of 170 days, postponed to the next half-year, or something else must be dropped. The data platform, well aligned but not urgent and risky, is postponed.

This reasoning in total days is not enough. If billing and the customer portal mobilise the same two developers in the first quarter, the ranking holds on paper and breaks in the capacity plan. The final test is done by skill and by month, not in overall days. It is almost always this test that forces the trade-offs.

The pitfalls

  • Everything is a priority. A list where ten projects have priority 1 is not prioritisation. You need a strict ranking, with no ties at the top of the list.
  • The grid adjusted after the fact. A weight that changes so that a project moves ahead destroys confidence in all subsequent rankings.
  • Prioritising without looking at capacity. A ranking that does not say where the cut-off line falls decides nothing.
  • Ring-fencing projects under way. What has already been spent is no reason to continue. A project under way is re-ranked on its estimate to complete and on the value still to be gained.
  • Not publishing what is refused. A request rejected without explanation comes back during the year, through the back door.

Who prioritises

Requesters present their projects and propose a score. The PMO prepares the grid, consolidates the scores and calculates the cut-off line. Management control challenges the estimates and the announced gains. The portfolio committee — executive management, finance, business units — decides, and its decision is traced project by project. The roles are worth writing down: see the RACI matrix.

Frequently asked questions

How do you prioritise projects when everything is urgent?

By first taking out the obligations — regulatory, end of support, contract — then applying the same grid to everything else, with a strict ranking. Urgency becomes one criterion among others, with a weight set in advance, instead of being the argument of whoever speaks loudest.

What is the difference between prioritisation and the annual project plan?

The annual plan decides the scope for the year, once a year, against the budget and capacity. Prioritisation decides the order, and is redone at every trade-off. The annual plan is the result of a first prioritisation; the quarterly reviews are the next ones.

How many criteria should a prioritisation grid have?

Four or five. With more, the criteria overlap, the scores bunch together and the ranking no longer discriminates. A few well-defined criteria, scored on a written scale, are better than twenty criteria scored by guesswork.

How often should you re-prioritise?

Every quarter for the portfolio, and with every significant new request. A new request never gets in without something in return: if it comes in above the cut-off line, another project drops out, and that is written down.

Should projects already launched be re-prioritised?

Yes, on their estimate to complete and on the value still to be gained — not on what has already been spent. Stopping a project halfway is expensive; continuing it when another would bring in more often costs more.

In CESAR.TEAM

What the platform does
  • Portfolio projects structured into sites and deliverables, with their budget.
  • A capacity plan by skill and by resource, with capacity calculated net of absences and non-project time.
  • Simulation of assignment scenarios on existing assignments.
  • Estimated cost at completion and estimate to complete consolidated at every level, for portfolio reviews.

See the Projects and Resources areas, and the IT departments page.

In the platform

The modules concerned

What this article describes is managed in these CESAR.TEAM modules.

See it in a demo

Let's see what it looks like on your projects

Tell us how you manage today: structure, closing rhythm, systems in place. We will prepare a demo on a comparable context.